Monday, 12 October 2009

Started work

After a brief trip into town to collect some rust treatment and various other much needed products, we set to work on the rust inside the boot, removing loose rust with a wire brush, hoovering and then applying the rust to metal converter. The unsupported exaust pipe has now been strapped up (Whether or not the original weld had broken on the drive home, we are unsure). New bolts have been fitted into the dashboard and the glovebox (to replace missing bolts), and lastly the off-side window has a new rivet to replace the broken rivet, to allow it to open and shut more efficiently.

No comments: